Rail Case

Machinery & Equipment China-Europe Railway Transport Solution

2026-07-05
2×40HQ
Cargo Volume
18 days
Rail Transport
9,000 km
Transport Distance
0
Equipment Damage

Client Background

A Zhengzhou, Henan-based automation equipment manufacturer supplying automated assembly lines to German auto parts plants. It had previously relied on ocean freight (Zhengzhou → Qingdao Port → Hamburg → Duisburg, about 45 days) to deliver equipment. With its German client facing a tight production-line upgrade schedule, the manufacturer needed a faster transport solution.

Client Requirements

Our Solution

China-Europe Railway Transport

The China-Europe Railway (Zhengzhou line) has a transit time of about 15–18 days, exactly meeting the 30-day door-to-door requirement. We dispatched a professional reinforcement team to the factory to complete shock-proof packaging and in-container bracing — using air-bag filling, moisture-proof film wrapping, and angle-steel frames to secure the base, ensuring zero movement throughout the journey.

Full Process

StageDetailsTransit Time
Factory Loading + ReinforcementProfessional team on site; loading and reinforcement completed in 2 days2 days
Dispatch from ZhengzhouTrucking to Zhengzhou International Land Port for rail dispatch1 day
China-Europe RailwayZhengzhou → Alashankou → Kazakhstan → Russia → Belarus → Poland → Duisburg, Germany16 days
German Customs ClearanceClearance at Duisburg terminal (ATA Carnet temporary import)2 days
Final-mile DeliveryDomestic truck delivery to the client's plant in Germany1 day

Total transit time: 22 days, 23 days faster than the ocean freight option and well under the 30-day deadline.

Results